Content Strategy Project: Putting It All Together
In this tutorial, you will learn about Content Strategy Project: Putting It All Together. We cover key concepts, practical examples, and best practices to help you master this topic.
The content strategy project applies all previous lessons to create a comprehensive content strategy for a real or simulated documentation site.
What You'll Learn
You will create a complete content strategy document including audience analysis, content audit, gap analysis, content plan, governance rules, maintenance schedule, metrics, and stakeholder communication.
Why It Matters
Applying content strategy concepts in a real project solidifies your understanding and creates a portfolio piece that demonstrates your skills.
Real-World Use
This project mirrors how DodaTech developed its content strategy. Each component was created iteratively, tested with real users, and refined based on metrics.
flowchart LR A[Project Phases] --> B[Research] A --> C[Plan] A --> D[Create] A --> E[Measure] B --> F[Audience Analysis] B --> G[Content Audit] C --> H[Gap Analysis] C --> I[Content Plan] D --> J[Governance] D --> K[Maintenance Schedule] E --> L[Metrics] E --> M[Stakeholder Report] F:::current classDef current fill:#f90,color:#fff,stroke:#333,stroke-width:2px
Phase 1: Research
Step 1: Choose a Project
Select a documentation site to work with. Options:
- Your current documentation at work
- An open source project
- A simulated project (describe the product)
# Project definition template
project = {
'name': 'DodaTech Tutorials',
'description': 'Programming and security tutorials',
'audience': 'Developers and IT professionals',
'current_page_count': 17357,
'current_support_tickets': 5000,
}
print(f"Creating strategy for: {project['name']}")
print(f"Audience: {project['audience']}")
Expected output:
Creating strategy for: DodaTech Tutorials
Audience: Developers and IT professionals
Step 2: Audience Analysis
Create 2-3 user personas based on research or assumptions.
personas:
- name: Priya
role: Junior Developer
skill: Beginner
goals:
- Learn Python basics
- Build first project
pain_points:
- Too much jargon
- Missing step-by-step guides
- name: Marcus
role: DevOps Engineer
skill: Expert
goals:
- Find specific references quickly
- Automate deployments
pain_points:
- Too many beginner tutorials
- Hard to find advanced content
Phase 2: Plan
Step 3: Content Audit
Create a sample content inventory with 10 pages. Evaluate and categorize each.
def sample_audit():
pages = [
{'title': 'Python Variables', 'accuracy': 9, 'quality': 8, 'views': 45000},
{'title': 'Python Loops', 'accuracy': 8, 'quality': 7, 'views': 28000},
{'title': 'Old Tutorial v1', 'accuracy': 3, 'quality': 4, 'views': 200},
]
for page in pages:
score = (page['accuracy'] + page['quality']) / 2
if score >= 8:
action = 'Keep'
elif score >= 5:
action = 'Improve'
else:
action = 'Archive'
print(f"{page['title']}: {action} (score {score})")
sample_audit()
Expected output:
Python Variables: Keep (score 8.5)
Python Loops: Improve (score 7.5)
Old Tutorial v1: Archive (score 3.5)
Step 4: Content Plan
Create a 1-month editorial calendar with 8 topics.
| Week | Topic | Type | Status |
|---|---|---|---|
| 1 | File Scanning in Python | Tutorial | Planned |
| 1 | Fixing ModuleNotFoundError | Quick Fix | Planned |
| 2 | Understanding Decorators | Explanation | Planned |
| 2 | API Authentication Guide | How-To | Planned |
| 3 | Flask Reference | Reference | Planned |
| 3 | Database Migration Guide | How-To | Planned |
| 4 | Security Best Practices | Tutorial | Planned |
| 4 | Performance Tuning | How-To | Planned |
Phase 3: Create
Step 5: Governance
Write 5 content governance rules.
## Governance Rules
1. Every page must have a meta description of 140-165 characters
2. Every tutorial must include 3+ code examples
3. Every page must include 5+ common mistakes
4. Content must be reviewed within 90 days of publication
5. No emojis in technical content
Step 6: Maintenance Schedule
Define review intervals by content type.
maintenance_schedule = {
'tutorial': {'interval_days': 90, 'owner': 'technical_writer'},
'reference': {'interval_days': 30, 'owner': 'engineering'},
'troubleshooting': {'interval_days': 90, 'owner': 'support'},
'how_to': {'interval_days': 180, 'owner': 'technical_writer'},
}
for content_type, config in maintenance_schedule.items():
print(f"{content_type}: every {config['interval_days']} days by {config['owner']}")
Expected output:
tutorial: every 90 days by technical_writer
reference: every 30 days by engineering
troubleshooting: every 90 days by support
how_to: every 180 days by technical_writer
Phase 4: Measure
Step 7: Metrics Dashboard
Define 5 key metrics and target values.
metrics:
- name: Content freshness
current: 64%
target: 90%
measurement: "Pages reviewed within 90 days"
- name: Support ticket reduction
current: "5000/month"
target: "3500/month"
measurement: "Tickets related to documented topics"
- name: Average time on page
current: "2.5 min"
target: "4 min"
measurement: "Google Analytics"
Step 8: Stakeholder Report
Create a one-page executive summary.
## Content Strategy Executive Summary
### Current State
- 17,357 pages, 64% fresh
- 5,000 support tickets per month
- Average time on page: 2.5 minutes
### Strategy Goals
- 90% content freshness
- 30% reduction in support tickets
- 4+ minutes average time on page
### Resource Requirements
- 1 content strategist
- 2 technical writers
- Automated freshness checking tools
### Expected Timeline
- Month 1: Audit and plan
- Months 2-3: Priority fixes
- Months 4-6: Full implementation
Common Mistakes
1. Making the Project Too Ambitious
A content strategy for the entire site is overwhelming. Focus on one section or content type for the project.
2. Skipping Audience Validation
Personas based on assumptions are unreliable. Validate with real data if possible.
3. Governance Without Enforcement
Writing governance rules without enforcement mechanisms is performative. Include linting and review steps.
4. No Measurement Plan
Without metrics, you cannot prove the strategy works. Define how you will measure success.
5. Presenting Without Context
A content strategy document with no explanation of the Process or trade-offs will not get buy-in.
Practice Questions
1. What are the four phases of the content strategy project?
Research, plan, create, and measure.
2. Why should you focus on one section for the project?
A focused project is completable. Trying to cover the entire site leads to an overwhelming and unfinished strategy.
3. What is the most important deliverable for getting stakeholder buy-in?
An executive summary with the current problem, proposed solution, expected ROI, and resource requirements.
4. How do you validate audience personas?
Through user interviews, surveys, analytics data, and feedback from customer-facing teams.
5. Challenge: Complete the content strategy project for a documentation site of your choice. Deliver a comprehensive strategy document with all components.
FAQ
Mini Project
Complete a full content strategy for a documentation section of your choice. Include audience personas, content audit, gap analysis, editorial calendar, governance rules, maintenance schedule, metrics dashboard, and stakeholder report.
What's Next
Congratulations on completing the content strategy module. Next, explore Information Architecture to organize your content effectively.
Built by the developers of DodaTech
Doda Browser, DodaZIP & Durga Antivirus Pro